Completed Projects

Water Supply Projects

 
Balara Pumping Station

     
 Marcos Alvarez Pumping Station

 
         
Rodriguez Water Treatment Plant

 
 
 San Juan Pumping Station 3
 
 
 San Juan Pumping Station 2 - Phase 2

  
San Juan Pumping Station 1

  
NTA / Amytyville Water System

  
San Rafael Pumping Station

  
Taguig Pumping Station

  
Lucban Pumping Station

  
MWCI - Kingsville Pumping Station

  
MWCI - Siruna Pumping Station

  
Marcos Alvarez Booster Pump Station


 
 Botong Pumping Station Expansion



Commercial Projects




Waste Water Projects










Water Supply Projects

Balara Pumping Station
Manila Water Project

M
DC-LEI Project
Php 225 Million

  



Upgrade of Balara Treatment Plant Compound
(2x 350HP & 3x 200HP FLOWSERVE Pumps & Motors)


  



Soundproof Generator Set House
(2x 2250 KVA Mitsubishi Stand-by Genset 1 & 7.5 Ton Motorized Overhead Crane)







 



2MVA Power Substation


 



Diesel Storage Tank
Fuel Storage Tank 10k Liters & Day Tank 2,500 Liters






Pipe Laying of 600mmØ D.I. Pipe


  



Laying of 1km. 1200mmØ Steel Pipes


  



  Back to top






Marcos Alvarez Pumping Station
Maynilad Project


Php 73 Million






  



Back to top








Rodriguez Water Treatment Plant
MDC & Bi-Water Project

Mechanical Installation works for Pumping Station and Generators, Subcontract for the design,
Fabricate, Supply and Delivery of low Voltage Panels.









Treated Water Pumping Station

6 units – 350Hp Pumps & Motors, 3 units – 200Hp Backwash Pumps & Motors
1700mm Butterfly Valve & Suction Pipes
1200mm Disge Pipes





1200 KW Generator Set





Fuel Day Tank






Low Voltage Switchgear and MCC Panels





RWP Intake






  



350HP Raw Water Pumps with Guide Rails and Duckfoot





Back to top








San Juan Pumping Station 3





Pump House


  





Pumping Station


  



Substation and Fuel Tank

Substation with 2000KVA Power Transformer, MVSG & LVSG


  



Generator Set House





Pipe Laying Works


  



Back to top








San Juan Pumping Station 2 - Phase 2

4 sets of 200HP Pumps and Motors


  



Back to top








San Juan Pumping Station 1

Pumping Station
Operates 3 units of 100HP Pump and Motors (350ø suction pipe & 300Ø disges pipe)


  



Valves & Fittings





Back to top







NTA / Amytyville Water System

NTA Reservoir
1.2 MLD Steel Tank Reservoir


  




Pumping Station
1.2 MLD Steel Tank Reservoir


  



Pipe Laying Works


  



Back to top








San Rafael Pumping Station Project

Pumping Station and Pump Motors





Power Substation and Generator Set





Back to top








Taguig Pumping Station Project

Pumping Station


  



Back to top








Lucban Pumping Station
Manila Water Project










Back to top








MWCI - Kingsville Pumping Station

1800KVA Genset





Transformer & HSVG





MCC Panels





Back to top








MWCI - Siruna Pumping Station


  



Back to top








Marcos Alvarez Booster Pump Station
of
Maynilad Water


Pumping Station



  



Genset House


  


Back to top








Botong Pumping Station Expansion
Manila Water


Construction of Ext. Pump House





Manila Water - LEI
On-going Project

Supply and Installation of MCC and LVSG





Back to top








Commercial Projects

TV5 - Media Center
Mandaluyong City






3 x 1800KW Generator Sets, Genset Panels
and Syncronizing Panels



  



2 x 3.75KVA Padmounted Transformers and Switchgear




  



LVSG, MTS / ATS Panel


  



Back to top




 
Waste Water Projects

Pinagsama STP and Facilities
Civil Works







  



Back to top





 Tank at Bonifacio Water Sewage Treatment Plant
Manila Water Project






700cum Equalization Tank


  



Leak Test at Equalization Tank – Chamber 1


  



Tapping of 400mmØ & 250mmØ Pipes


  



Back to top




 
Magallanes Sewage Treatment Plant
Manila Water


Rehabilitation of Sewage Treatment Plant






Replacement of defective blower





Installation of ABS Pipe 100MM Dia @ Water Tank


  





  



Back to top